| Project Name | Project Created On | Facility Name | City | County | Type of Work | Estimated Cost | Estimated Start Date | Estimated End Date |
|---|---|---|---|---|---|---|---|---|
| 1006 E Cesar Chavez Office Remodel | Oct. 05, 2026 | 1006 E Cesar Chavez St | Austin | Travis | Renovation/Alteration | $150,000 | Nov. 02, 2026 | Dec. 31, 2026 |
| Roselle Pizzeria | Oct. 05, 2026 | N/a | Austin | Travis | Renovation/Alteration | $500,000 | Jan. 07, 2027 | Jun. 10, 2027 |
| Absolute Machine And Tooling | Oct. 05, 2026 | Absolute Machine And Tooling | Leander | Williamson | Renovation/Alteration | $1,000,000 | Dec. 01, 2026 | Jun. 30, 2027 |
| Cross Creek Commercial Park-Suite 705 Ifo | Oct. 05, 2026 | Cross Creek Commercial Park Building 7 | Georgetown | Williamson | New Construction | $175,000 | Dec. 01, 2026 | Apr. 09, 2027 |
| Enovis Cleanroom | Oct. 05, 2026 | Enovis - Cedar Park | Leander | Williamson | Renovation/Alteration | $6,000,000 | Nov. 02, 2026 | Apr. 20, 2027 |
| Hobby Lobby Manor | Oct. 05, 2026 | Hobby Lobby | Manor | Travis | New Construction | $6,000,000 | Dec. 15, 2026 | Jul. 23, 2027 |
| Dick's Sporting Good 1727 - Bastrop Tx | Oct. 05, 2026 | Burleson Crossing East | Bastrop | Bastrop | New Construction | $11,000,000 | Dec. 01, 2026 | Dec. 31, 2027 |
| Imaginatation Play Space Llc | Oct. 05, 2026 | Imaginatation Play Space Llc | Florence | Williamson | Renovation/Alteration | $264,000 | Oct. 05, 2026 | Jan. 01, 2027 |
| Tesla Railhead | Oct. 05, 2026 | Rcr Taylor Logistics Park | Taylor | Williamson | New Construction | $1,600,000 | Oct. 26, 2026 | Dec. 18, 2026 |
| Minimax #8 | Oct. 03, 2026 | Howard Dessau Retail Center | Austin | Travis | New Construction | $2,000,000 | Jan. 15, 2027 | Sep. 30, 2027 |
| Dovetail Custom Woodworks Addition | Oct. 03, 2026 | Dovetail Custom Woodworks | Del Valle | Travis | Additions to Existing Building | $800,000 | Apr. 12, 2026 | Nov. 30, 2026 |
| Hamilton Pool Office Park - Building C | Oct. 02, 2026 | Building C | Austin | Travis | New Construction | $1,300,000 | Oct. 05, 2026 | Jul. 01, 2027 |
| Hamilton Pool Office Park - Building B | Oct. 02, 2026 | Building B | Austin | Travis | New Construction | $1,500,000 | Oct. 05, 2026 | Jul. 01, 2027 |
| Cuantos Tacos | Oct. 02, 2026 | N/a | Austin | Travis | Renovation/Alteration | $200,000 | Jan. 01, 2026 | Mar. 31, 2027 |
| Ascension Seton Medical Plaza X-Ray Room Renovation | Oct. 02, 2026 | Ascension Seton Medical Plaza | Austin | Travis | Renovation/Alteration | $190,000 | Oct. 15, 2026 | Apr. 15, 2027 |
| National Bank & Trust Bastrop | Oct. 02, 2026 | National Bank & Trust | Bastrop | Bastrop | New Construction | $2,500,000 | Oct. 29, 2026 | Oct. 29, 2027 |
| Austin Airpark 130 Phase 02-Bldg 2 | Oct. 02, 2026 | Austin Airpark 130-Building 2 | Del Valle | Travis | Renovation/Alteration | $8,000,000 | Dec. 01, 2026 | Sep. 01, 2027 |
| Amat B34 Automated Cleanroom Fit Up | Oct. 02, 2026 | Applied Materials Building 34 | Austin | Travis | Renovation/Alteration | $1,200,000 | Oct. 15, 2026 | Mar. 17, 2027 |
| Liberty Ranch Commons | Oct. 02, 2026 | Liberty Ranch Commons | Liberty Hill | Williamson | New Construction | $1,750,000 | May. 03, 2027 | Oct. 29, 2027 |
| Gringos Tex-Mex Kyle | Oct. 02, 2026 | Gringos Tex-Mex | Kyle | Hays | New Construction | $5,000,000 | May. 15, 2027 | Feb. 15, 2028 |
| Hamilton Pool Office Park - Building A | Oct. 02, 2026 | Building A | Austin | Travis | New Construction | $1,500,000 | Oct. 05, 2026 | Jul. 01, 2027 |
| Goodnight Ranch South Amenity Center | Oct. 02, 2026 | Goodnight Ranch South Amenity Center | Austin | Travis | New Construction | $2,615,163 | Nov. 15, 2026 | Sep. 25, 2027 |
| Multi- Tenant Development | Oct. 01, 2026 | Multi- Tenant Development | Bastrop | Bastrop | New Construction | $600,000 | Mar. 01, 2027 | Sep. 01, 2027 |
| Cambridge Office 1c | Oct. 01, 2026 | Cambridge Towers | Austin | Travis | Renovation/Alteration | $300,000 | Nov. 01, 2026 | Apr. 30, 2027 |
| Ocmpd Phase 2 Section 2 - Hillside Park | Oct. 01, 2026 | Ocmpd Phase 2 Section 2 - Hillside Park | Austin | Travis | New Construction | $2,600,574 | Nov. 15, 2026 | Sep. 25, 2027 |
| Sas Gcs Capa-Up - Tior06 & Tior10 Demo | Oct. 01, 2026 | Samsung Austin Semiconductor | Austin | Travis | Renovation/Alteration | $300,000 | Oct. 09, 2026 | Dec. 23, 2026 |
| Hero Way - Leander - Austin Endoscopy Center Iv Expansion - Phase 1 | Oct. 01, 2026 | Austin Gastroenterology Leander - Hero Way | Leander | Williamson | Renovation/Alteration | $1,000,000 | Dec. 01, 2026 | May. 01, 2027 |
| Jupiter Power | Oct. 01, 2026 | Jupiter Power | Austin | Travis | Renovation/Alteration | $1,400,000 | Nov. 01, 2026 | Mar. 15, 2027 |
| Texas Food & Fuel Association Ti | Oct. 01, 2026 | Texas Bankers Association | Austin | Travis | Renovation/Alteration | $300,000 | Oct. 19, 2026 | Jan. 31, 2027 |
| Ets Performance Tfo | Oct. 01, 2026 | Live Oak Ranch | Leander | Williamson | New Construction | $140,000 | Nov. 01, 2026 | Dec. 31, 2026 |
| Phenix & Saenz Ti | Oct. 01, 2026 | Texas Bankers Association | Austin | Travis | Renovation/Alteration | $300,000 | Oct. 19, 2026 | Jan. 31, 2027 |
| Hance Scarborough Expansion Ti | Oct. 01, 2026 | Texas Bankers Association | Austin | Travis | Renovation/Alteration | $300,000 | Oct. 19, 2026 | Jan. 31, 2027 |
| Everi Games Interior Remodel | Oct. 01, 2026 | Northtech 5 & 6 Ltd | Austin | Travis | Renovation/Alteration | $950,000 | Oct. 29, 2026 | Feb. 04, 2027 |
| Ao Hubbard - Voyant | Oct. 01, 2026 | Austin Oaks Hubbard | Austin | Travis | Renovation/Alteration | $559,148 | Oct. 26, 2026 | Jan. 29, 2027 |
| Casey's General Store Lago Vista, Tx #4706 | Oct. 01, 2026 | Casey's General Store | Lago Vista | Travis | Renovation/Alteration | $876,014 | Nov. 02, 2026 | Jan. 08, 2027 |
| Northline Block O Picp | Oct. 01, 2026 | Northline Block O Picp | Leander | Williamson | New Construction | $400,000 | Oct. 01, 2026 | Oct. 05, 2026 |
| Bessie's | Sep. 30, 2026 | Amli | Austin | Travis | Renovation/Alteration | $500,000 | Sep. 30, 2026 | Jan. 01, 2027 |
| Lehman Road Pump Station Improvements | Sep. 30, 2026 | Lehman Pump Station | Kyle | Hays | Renovation/Alteration | $24,000,000 | Jan. 10, 2027 | Jun. 10, 2028 |
| Vip Nail Spa | Sep. 30, 2026 | Vip Nail Spa | Pflugerville | Travis | New Construction | $150,000 | Oct. 30, 2026 | Dec. 27, 2026 |
| Leander Drive Warehouses Bldgs. 3 And 4 | Sep. 30, 2026 | Leander Drive Warehouses | Leander | Williamson | New Construction | $1,220,990 | Nov. 01, 2026 | May. 31, 2027 |
| 1300 E 5th L4 Multi Tenant Corridor | Sep. 30, 2026 | 1300 E 5th St | Austin | Travis | New Construction | $200,000 | Oct. 19, 2026 | Jan. 25, 2027 |
| Lite & Barricade | Sep. 30, 2026 | Lite & Barricade | Hutto | Williamson | New Construction | $1,000,000 | Sep. 16, 2026 | Sep. 15, 2028 |
| Lutron - Ketra Showroom - Austin | Sep. 30, 2026 | Building A | Austin | Travis | Renovation/Alteration | $915,500 | Nov. 02, 2026 | Jun. 01, 2027 |
| Asme Phase 2 - Building B | Sep. 30, 2026 | Parmer Sector 8 | Austin | Travis | Renovation/Alteration | $450,000 | Oct. 28, 2026 | Jan. 27, 2027 |
| Clearwater Express - N Lamar | Sep. 30, 2026 | Clearwater Express Car Wash | Austin | Travis | New Construction | $1,250,000 | Dec. 09, 2026 | Sep. 15, 2027 |
| Storage | Sep. 30, 2026 | Ba03 | Bastrop | Bastrop | New Construction | $7,000,000 | Oct. 26, 2026 | May. 28, 2027 |
| 17th Floor Spec Suites | Sep. 30, 2026 | Atx Tower | Austin | Travis | Renovation/Alteration | $2,900,000 | Nov. 01, 2026 | Aug. 01, 2027 |
| H&r Block - Pflugerville | Sep. 30, 2026 | H&r Block - Pflugerville | Pflugerville | Travis | Renovation/Alteration | $50,000 | Nov. 01, 2026 | Jan. 01, 2027 |
| Crockett High School - Exterior Additions | Sep. 30, 2026 | Crockett High School | Austin | Travis | Additions to Existing Building | $230,000 | Feb. 02, 2026 | Feb. 28, 2027 |
| Prime Office Flex Spaces Leander | Sep. 30, 2026 | Building 4 | Leander | Williamson | New Construction | $400,000 | Sep. 10, 2026 | Dec. 10, 2026 |
| Skybox Hutto 4 - Core/shell | Sep. 30, 2026 | Building 4 | Hutto | Williamson | New Construction | $550,000,000 | Jan. 20, 2027 | Oct. 30, 2028 |
| Menchaca Apartments | Sep. 30, 2026 | Clubhouse | Austin | Travis | New Construction | $13,000,000 | Jan. 30, 2027 | Jan. 20, 2029 |
| Dave's Hot Chicken -Austin Tx | Sep. 30, 2026 | Dave's Hot Chicken | Austin | Travis | Renovation/Alteration | $500,000 | Jan. 18, 2027 | Jun. 05, 2027 |
| Scott Douglass & Mcconnico, Llp | Sep. 30, 2026 | Colorado Tower | Austin | Travis | Renovation/Alteration | $1,132,500 | Nov. 13, 2026 | Mar. 05, 2027 |
| Sam's Club 6259.1013-Remodel | Sep. 30, 2026 | Sam's Club 6259 | Round Rock | Williamson | Renovation/Alteration | $9,700,000 | Jun. 13, 2027 | Oct. 28, 2027 |
| 5480-1025 Round Rock Tx - Kangaroo | Sep. 30, 2026 | Walmart | Round Rock | Williamson | Renovation/Alteration | $64,000 | Oct. 01, 2026 | Nov. 06, 2026 |
| Jetset Pilates Georgetown Tx | Sep. 30, 2026 | Shops At Bluebonnet Plaza | Georgetown | Williamson | Renovation/Alteration | $400,000 | Nov. 01, 2026 | Feb. 01, 2027 |
| Rm Business Llc (Prop Convenience Store) | Sep. 29, 2026 | 79 Express | Taylor | Williamson | New Construction | $2,000,000 | Sep. 16, 2026 | Sep. 15, 2028 |
| Sh 71 (Csj: 0265-03-042) | Sep. 29, 2026 | Csj: 0265-03-042 | Cedar Creek | Bastrop | New Construction | $62,500,000 | Apr. 05, 2027 | Mar. 07, 2029 |
| Ceas Attachment Offices | Sep. 29, 2026 | Airfield 130 | Del Valle | Travis | Renovation/Alteration | $1,000,000 | Oct. 01, 2026 | Feb. 01, 2027 |
| Wonder- The Triangle | Sep. 29, 2026 | The Triangle | Austin | Travis | Renovation/Alteration | $900,000 | Feb. 08, 2027 | Apr. 19, 2027 |
| Williamson County Regional Animal Shelter Addition | Sep. 29, 2026 | Williamson County Regional Animal Shelter | Georgetown | Williamson | Additions to Existing Building | $14,000,000 | Nov. 01, 2026 | Jan. 01, 2027 |
| Exl Wellness | Sep. 29, 2026 | 1300 Guadalupe Street | Austin | Travis | Renovation/Alteration | $250,000 | Nov. 01, 2026 | Feb. 24, 2027 |
| Old Navy | Sep. 29, 2026 | Round Rock Premium | Round Rock | Williamson | Renovation/Alteration | $700,000 | Feb. 01, 2027 | May. 12, 2027 |
| Twist & Buckle | Sep. 29, 2026 | The Crescent | Austin | Travis | Renovation/Alteration | $100,000 | Nov. 16, 2026 | Mar. 16, 2027 |
| Brick & Timber Collective | Sep. 29, 2026 | Music Lane Building 9 | Austin | Travis | Renovation/Alteration | $2,000,000 | Oct. 01, 2026 | Oct. 01, 2027 |
| Sas 2026 Capital Projects - Fab1 Icpms | Sep. 29, 2026 | Samsung Austin Semiconductor | Austin | Travis | Renovation/Alteration | $810,000 | Oct. 30, 2026 | Feb. 28, 2027 |
| Ih 35, Etc. (Csj: 0015-13-432, Etc.) | Sep. 29, 2026 | Csj: 0015-13-432, Etc. | Austin | Travis | New Construction | $407,791,049 | Feb. 01, 2027 | Feb. 17, 2032 |
| Liberty Hill Edc - Ada Updates | Sep. 29, 2026 | Liberty Hill Economic Development Office | Liberty Hill | Williamson | Renovation/Alteration | $65,000 | Oct. 19, 2026 | Dec. 31, 2026 |
| 1005 Congress Lobby Renovations | Sep. 29, 2026 | 1005 Congress | Austin | Travis | Renovation/Alteration | $295,474 | Dec. 01, 2025 | Feb. 15, 2027 |
| Lmg Burleson Shallow Bay | Sep. 29, 2026 | Lmg Burleson Shallow Bay | Austin | Travis | New Construction | $4,698,561 | Dec. 10, 2026 | Sep. 08, 2027 |
| Parts Tree Office Expansion & Warehouse Renovation | Sep. 29, 2026 | Montopolis 1 | Austin | Travis | Renovation/Alteration | $600,000 | Oct. 26, 2026 | Feb. 15, 2027 |
| Brent Blvd Sidewalk Improvements | Sep. 28, 2026 | Brent Blvd Sidewalk Improvements | Kyle | Hays | New Construction | $205,579 | Nov. 30, 2026 | Feb. 25, 2027 |
| Mount Calm / Dime Box | Sep. 28, 2026 | 500w | Austin | Travis | Renovation/Alteration | $444,000 | Nov. 01, 2026 | Feb. 01, 2027 |
| Residence Inn By Marriott | Sep. 28, 2026 | Residence Inn By Marriott | Hutto | Williamson | New Construction | $11,000,000 | Dec. 15, 2026 | Sep. 30, 2028 |
| 183a Rodeo C-Store | Sep. 28, 2026 | 183a Rodeo C-Store | Leander | Williamson | New Construction | $1,500,000 | Apr. 05, 2027 | Dec. 30, 2027 |
| Gringo's Tex-Mex Leander | Sep. 27, 2026 | Gringo's Tex-Mex | Leander | Williamson | New Construction | $5,000,000 | May. 15, 2027 | Feb. 15, 2028 |
| Metro Drive Professional & Medical Office Park Phase 2 Bldg 6 | Sep. 27, 2026 | Bldg 6 | Leander | Williamson | New Construction | $136,400 | Nov. 02, 2026 | Nov. 15, 2027 |
| Los Vaqueros #3 | Sep. 27, 2026 | Los Vaqueros | Round Rock | Williamson | Renovation/Alteration | $300,000 | Nov. 03, 2026 | Jun. 26, 2027 |
| Lemberg Roastery & Bakery | Sep. 26, 2026 | The Square At Crystal Falls - Bldg. 1 | Leander | Williamson | Renovation/Alteration | $250,000 | Oct. 19, 2026 | Dec. 14, 2026 |
| Kilwins Cedar Park | Sep. 25, 2026 | Kilwins | Cedar Park | Williamson | Renovation/Alteration | $350,000 | Jan. 25, 2027 | May. 07, 2027 |
| Quiktrip #4139 | Sep. 25, 2026 | Quiktrip #4139 | Jarrell | Williamson | New Construction | $850,000 | May. 24, 2027 | Jan. 20, 2028 |
| Lskd Inter Interior Renovation | Sep. 25, 2026 | 1704 Congress | Austin | Travis | Renovation/Alteration | $250,000 | Nov. 01, 2026 | Dec. 01, 2026 |
| Costco #1322 Pflugerville - Fuel Facility Generator Addition | Sep. 25, 2026 | Costco Wholesale #1322 Fuel Facility | Pflugerville | Travis | Renovation/Alteration | $165,000 | Jan. 01, 2027 | Jan. 31, 2027 |
| Costco #1152 Cedar Park - Fuel Facility Generator Addition | Sep. 25, 2026 | Costco Wholesale #1152 Fuel Facility | Cedar Park | Williamson | Renovation/Alteration | $165,000 | Jan. 01, 2027 | Jan. 31, 2027 |
| Leander Retail Project #1 | Sep. 25, 2026 | Leander Retail Project #1 | Leander | Williamson | Renovation/Alteration | $250,000 | Oct. 05, 2026 | Dec. 25, 2026 |
| The Ridge Apartments | Sep. 25, 2026 | Building 1 | Austin | Travis | New Construction | $11,750,000 | Jan. 01, 2027 | Jul. 01, 2028 |
| Costco #681 Austin - Fuel Facility Generator Addition | Sep. 25, 2026 | Costco Wholesale #681 Fuel Facility | Austin | Travis | Renovation/Alteration | $155,000 | Jun. 08, 2026 | Jul. 03, 2026 |
| Osgood On 8th | Sep. 25, 2026 | Osgood On 8th | Georgetown | Williamson | New Construction | $2,500,000 | Feb. 01, 2027 | Apr. 30, 2028 |
| Costco #1629 Kyle - Fuel Facility Generator Addition | Sep. 25, 2026 | Costco Wholesale #1629 Fuel Facility | Kyle | Hays | Renovation/Alteration | $165,000 | Jan. 01, 2027 | Jan. 31, 2027 |
| Costco #1385 Georgetown - Fuel Facility Generator Addition | Sep. 25, 2026 | Costco Wholesale #1385 Fuel Facility | Georgetown | Williamson | Renovation/Alteration | $200,000 | Oct. 01, 2026 | Oct. 25, 2026 |
| Remodel Of Substation For Parks And Recreation | Sep. 25, 2026 | Substation For Parks And Recreation | Fredericksburg | Gillespie | Renovation/Alteration | $350,000 | Jan. 01, 2027 | Aug. 01, 2027 |
| Switchyards | Sep. 24, 2026 | Switchyards | Austin | Travis | Renovation/Alteration | $70,000 | Sep. 18, 2026 | Nov. 01, 2026 |
| Elite Auto Body | Sep. 24, 2026 | Elite Auto Body | Georgetown | Williamson | New Construction | $2,000,000 | Nov. 01, 2026 | Feb. 01, 2027 |
| Presidio | Sep. 24, 2026 | Quarry Lake Ii | Austin | Travis | Renovation/Alteration | $190,000 | Oct. 19, 2026 | Dec. 31, 2026 |
| The Friedkin Group | Sep. 24, 2026 | Music Lane Building 3 | Austin | Travis | Renovation/Alteration | $200,000 | Oct. 15, 2026 | Nov. 30, 2026 |
| Standard Austin | Sep. 24, 2026 | 1603 S Congress Avenue | Austin | Travis | Renovation/Alteration | $9,000,000 | Aug. 24, 2026 | Mar. 01, 2027 |
| Milano Nail Spa | Sep. 23, 2026 | Liberty Hill Crossing | Liberty Hill | Williamson | New Construction | $750,000 | Nov. 15, 2026 | May. 15, 2027 |
| Brushy Building 2 | Sep. 23, 2026 | Brushy Speakeasy | Leander | Travis | New Construction | $1,524,500 | Dec. 30, 2026 | Sep. 30, 2027 |
| Brushy Building 1 | Sep. 23, 2026 | Brushy Restaurant & Bar | Leander | Williamson | New Construction | $2,725,500 | Dec. 30, 2026 | Sep. 30, 2027 |