| Project Name | Project Created On | Facility Name | City | County | Type of Work | Estimated Cost | Estimated Start Date | Estimated End Date |
|---|---|---|---|---|---|---|---|---|
| Mai Office Finishout | Oct. 05, 2026 | Dominion Place - Building 12 | San Antonio | Bexar | Renovation/Alteration | $250,000 | Oct. 12, 2026 | Jan. 15, 2027 |
| Maske Road Development | Oct. 05, 2026 | N/a | Schertz | Guadalupe | New Construction | $1,500,000 | Jan. 01, 2027 | Jun. 01, 2027 |
| Mr Nail Lounge | Oct. 05, 2026 | Encino Commons Ltd | San Antonio | Bexar | Renovation/Alteration | $200,000 | Oct. 12, 2026 | Apr. 30, 2027 |
| Elmendorf Self Storage | Oct. 02, 2026 | Elmendorf Self Storage | Elmendorf | Bexar | New Construction | $700,000 | Oct. 09, 2026 | Oct. 01, 2027 |
| Magnolia Medical & Aesthetics | Oct. 02, 2026 | Stone Oak Crossing Phase 1 | San Antonio | Bexar | Renovation/Alteration | $250,000 | Nov. 01, 2026 | Jun. 25, 2027 |
| Goldfield Dr | Oct. 02, 2026 | Goldfield Dr | San Antonio | Bexar | New Construction | $1,000,000 | Oct. 31, 2026 | Apr. 30, 2027 |
| Empower Behavioral Health | Oct. 02, 2026 | 844 Walnut Dr | New Braunfels | Comal | Renovation/Alteration | $250,000 | Oct. 01, 2026 | Feb. 01, 2027 |
| Leon Valley Veterinary Hospital | Oct. 02, 2026 | . | San Antonio | Bexar | Renovation/Alteration | $625,467 | Oct. 26, 2026 | Feb. 26, 2027 |
| New Multi-Purpose Pavilion | Oct. 02, 2026 | St. John The Evangelist Catholic Church | Hondo | Medina | New Construction | $500,000 | Jan. 15, 2027 | May. 15, 2027 |
| District 7 Neighborhood: Pedestrian Mobility & Street Improvements - W Mulberry Ave | Oct. 02, 2026 | Na | San Antonio | Bexar | Renovation/Alteration | $637,898 | Nov. 02, 2026 | Mar. 31, 2027 |
| Communicare- Additional Parking | Oct. 02, 2026 | Communicare Call Center | San Antonio | Bexar | New Construction | $142,000 | Nov. 01, 2026 | Jan. 31, 2027 |
| Mohamed Shehab Dds Pllc | Oct. 02, 2026 | . | San Antonio | Bexar | Renovation/Alteration | $543,179 | Oct. 26, 2026 | Feb. 26, 2027 |
| Valvoline | Oct. 02, 2026 | Valvoline | San Antonio | Bexar | New Construction | $1,449,000 | Mar. 08, 2027 | Sep. 13, 2027 |
| 104 E. Hart Ave | Oct. 01, 2026 | 104 E. Hart Ave | San Antonio | Bexar | Renovation/Alteration | $108,000 | Jan. 01, 2027 | Jan. 01, 2028 |
| 111 W Travis | Oct. 01, 2026 | 111 W Travis | San Antonio | Bexar | Additions to Existing Building | $15,500,000 | Feb. 01, 2027 | Aug. 01, 2027 |
| Building 1 Tenant Finish Out | Oct. 01, 2026 | Building 1 | San Antonio | Bexar | Renovation/Alteration | $451,870 | Dec. 01, 2026 | Dec. 01, 2028 |
| Tia's Taco Hut | Oct. 01, 2026 | Aycock Retail | San Antonio | Bexar | New Construction | $225,000 | Jan. 29, 2027 | Apr. 30, 2027 |
| Cp-Fy26-005 Cmhe 4th Fl Library Renovation | Oct. 01, 2026 | Ut San Antonio | San Antonio | Bexar | Renovation/Alteration | $600,000 | Oct. 12, 2026 | Feb. 01, 2027 |
| Wingstop (Gl#ad056) | Oct. 01, 2026 | Wingstop | Cibolo | Guadalupe | Renovation/Alteration | $300,000 | Dec. 10, 2026 | Mar. 12, 2027 |
| Intertek | Oct. 01, 2026 | Testing Building | Elmendorf | Bexar | New Construction | $250,000 | Dec. 01, 2026 | Mar. 31, 2027 |
| Urban Soccer (San Antonio, Llc) | Oct. 01, 2026 | Gm7 50k | San Antonio | Bexar | Renovation/Alteration | $400,000 | Oct. 19, 2026 | Dec. 31, 2026 |
| Shaenfield Road Self-Storage | Oct. 01, 2026 | Shaenfield Road Self-Storage | San Antonio | Bexar | New Construction | $10,000,000 | Jan. 04, 2027 | Jan. 07, 2028 |
| 260409 | Sep. 30, 2026 | Babcock Tower 1 Level 4 Suite 426 + 429 Renovation | San Antonio | Bexar | Renovation/Alteration | $518,700 | Nov. 16, 2026 | Feb. 26, 2027 |
| New Shell Bldg. @ The Park On Huebner | Sep. 30, 2026 | Building #3 | San Antonio | Bexar | New Construction | $750,000 | Nov. 01, 2026 | Apr. 30, 2027 |
| Alamo Colleges District - Wetc Memorial | Sep. 30, 2026 | Acd Wetc Memorial | San Antonio | Bexar | New Construction | $511,000 | Nov. 04, 2026 | Mar. 17, 2027 |
| Huebner Smiles & Braces | Sep. 30, 2026 | . | San Antonio | Bexar | New Construction | $641,603 | Feb. 01, 2027 | Jun. 25, 2027 |
| Freeport San Antonio Central Spec Office | Sep. 30, 2026 | Building 4 | San Antonio | Bexar | New Construction | $550,000 | Oct. 01, 2026 | Jan. 31, 2027 |
| Republic Finance Tenant Buildout | Sep. 29, 2026 | Republic Finance San Antonio | San Antonio | Bexar | Renovation/Alteration | $133,524 | Oct. 15, 2026 | Nov. 15, 2026 |
| Idv Hollingsworth - Racking | Sep. 29, 2026 | Idv Park 35 Building 6 | Schertz | Comal | Renovation/Alteration | $200,000 | Dec. 04, 2026 | Dec. 04, 2027 |
| Comeback Sports | Sep. 29, 2026 | Westover Market Place | San Antonio | Bexar | Renovation/Alteration | $125,000 | Sep. 25, 2026 | Apr. 01, 2027 |
| Allsup And Flagle Drainage | Sep. 29, 2026 | N/a | San Antonio | Bexar | Renovation/Alteration | $1,500,000 | Jan. 04, 2027 | Jul. 30, 2027 |
| Christus Nb Cath Lab Equipment Replacement | Sep. 29, 2026 | Christus Hospital | New Braunfels | Comal | Renovation/Alteration | $61,000 | Oct. 01, 2026 | Feb. 21, 2027 |
| Broadview & Oakwood Drainage | Sep. 29, 2026 | N/a | San Antonio | Bexar | Renovation/Alteration | $7,000,000 | Dec. 01, 2026 | Apr. 01, 2028 |
| Southland San Antonio Office | Sep. 28, 2026 | Southland Industries | Schertz | Guadalupe | Renovation/Alteration | $6,600,000 | Oct. 05, 2026 | Feb. 05, 2027 |
| Back 9 Hardy Oak | Sep. 28, 2026 | Shops At Hardy Oak | San Antonio | Bexar | Renovation/Alteration | $176,843 | Nov. 01, 2026 | Mar. 01, 2027 |
| 11803 Bandera Rd | Sep. 28, 2026 | 11803 Bandera Rd | Helotes | Bexar | Renovation/Alteration | $500,000 | Nov. 01, 2026 | Apr. 01, 2027 |
| Cbc 151 | Sep. 28, 2026 | Community Bible Church | San Antonio | Bexar | Renovation/Alteration | $2,000,000 | Nov. 01, 2026 | Mar. 14, 2027 |
| Popup Bagels | Sep. 28, 2026 | Popup Bagels | San Antonio | Bexar | Renovation/Alteration | $350,000 | Oct. 19, 2026 | Dec. 16, 2026 |
| Milsa Plaza | Sep. 28, 2026 | Milsa Plaza | San Antonio | Bexar | New Construction | $850,000 | Jan. 04, 2027 | Jul. 09, 2027 |
| Walnut Branch Unit 6a & 6b | Sep. 28, 2026 | Sidewalk On Public Street | Seguin | Guadalupe | New Construction | $298,663 | Jul. 01, 2026 | Feb. 01, 2027 |
| Alera Group | Sep. 28, 2026 | Concord Plaza | San Antonio | Bexar | Renovation/Alteration | $1,457,500 | Sep. 28, 2026 | Jan. 31, 2027 |
| Laurel Heights United Methodist Church Day School Addition | Sep. 25, 2026 | Laure Heights United Methodist Church | San Antonio | Bexar | Additions to Existing Building | $150,000 | Oct. 14, 2026 | Oct. 14, 2027 |
| #26062 - Jw Marriott - Upper/lower Lobby Remodel | Sep. 25, 2026 | Jw Marriott San Antonio Hill Country Resort & Spa | San Antonio | Bexar | Renovation/Alteration | $4,800,000 | Nov. 01, 2026 | Mar. 31, 2027 |
| Marion Isd - Genevieve Moore Elementary School | Sep. 25, 2026 | Genevieve Moore Elementary School | Marion | Guadalupe | New Construction | $45,000,000 | Jan. 15, 2027 | Jul. 15, 2028 |
| Costco #1449 West San Antonio - Fuel Facility Generator Addition | Sep. 25, 2026 | Costco Wholesale #1449 Fuel Facility | San Antonio | Bexar | Renovation/Alteration | $165,000 | Jan. 01, 2027 | Jan. 31, 2027 |
| Eos Fitness Blanco | Sep. 25, 2026 | Eos Fitness | San Antonio | Bexar | Renovation/Alteration | $3,153,975 | Sep. 01, 2026 | Mar. 01, 2027 |
| Stratus Surfaces | Sep. 25, 2026 | Interpark Bldg 5 | San Antonio | Bexar | New Construction | $700,000 | Nov. 27, 2026 | Jun. 30, 2027 |
| Fork To Fit Interior Finish Out | Sep. 25, 2026 | Shell Bldg | Boerne | Kendall | New Construction | $390,000 | Nov. 02, 2026 | Mar. 20, 2027 |
| Shaenfield Road Retail Shell | Sep. 24, 2026 | Shaenfield Road Retail Shell | San Antonio | Bexar | New Construction | $3,400,000 | Jan. 04, 2027 | Oct. 30, 2027 |
| New Tenant Finish Out For Sonora Bank - Boerne East Annex | Sep. 24, 2026 | Building "b" | Boerne | Kendall | Renovation/Alteration | $550,000 | Oct. 26, 2026 | May. 31, 2027 |
| Dermatology Center | Sep. 24, 2026 | Shavano Oaks 2 | San Antonio | Bexar | Renovation/Alteration | $101,000 | Oct. 08, 2026 | Dec. 31, 2026 |
| Parking Lot Drainage Repair Project | Sep. 24, 2026 | Saws Westside Operations Center | San Antonio | Bexar | Renovation/Alteration | $270,000 | Nov. 06, 2026 | Jul. 15, 2027 |
| Ronin New Braunfels Assisted Living | Sep. 24, 2026 | Assisted Living | New Braunfels | Comal | New Construction | $11,625,000 | Dec. 01, 2026 | Dec. 31, 2027 |
| United Alloy Warehouse | Sep. 24, 2026 | United Alloy | Seguin | Guadalupe | New Construction | $900,000 | Oct. 05, 2026 | Jan. 31, 2027 |
| Cheddar's Scratch Kitchen - San Antonio, Tx (Casa Blanca) | Sep. 24, 2026 | Cheddar's Scratch Kitchen | San Antonio | Bexar | New Construction | $3,800,000 | Feb. 15, 2027 | Aug. 23, 2027 |
| Visit San Antonio | Sep. 24, 2026 | Weston Centre | San Antonio | Bexar | Renovation/Alteration | $1,092,000 | Oct. 01, 2026 | Apr. 30, 2027 |
| Marion C-Store | Sep. 23, 2026 | Fast Fuel | Marion | Guadalupe | New Construction | $1,500,000 | Dec. 01, 2026 | May. 01, 2028 |
| Armadillo Top Rope | Sep. 23, 2026 | Armadillo Stone Oak | San Antonio | Bexar | New Construction | $5,500,000 | Feb. 01, 2027 | May. 01, 2027 |
| The Shops At Culebra West | Sep. 23, 2026 | The Shops At Culebra West | San Antonio | Bexar | New Construction | $1,550,000 | Dec. 01, 2026 | Feb. 26, 2027 |
| Ignite Pilates Studio Interior Finish-Out | Sep. 23, 2026 | Boerne Center | Boerne | Kendall | Renovation/Alteration | $150,000 | Oct. 15, 2026 | Feb. 28, 2027 |
| Valvoline | Sep. 23, 2026 | Valvoline | San Antonio | Bexar | New Construction | $1,449,000 | Mar. 22, 2027 | Sep. 27, 2027 |
| Salado Creek Greenway - Fort Sam Segment | Sep. 23, 2026 | Jack White Tailhead | San Antonio | Bexar | New Construction | $5,000,000 | Feb. 08, 2027 | Feb. 25, 2028 |
| Enlake - Tfo | Sep. 23, 2026 | Enlake | Universal City | Bexar | New Construction | $150,000 | Sep. 23, 2026 | Oct. 23, 2026 |
| Westoke South- Tfo | Sep. 23, 2026 | Westoke South | Helotes | Bexar | New Construction | $150,000 | Sep. 27, 2026 | Oct. 27, 2026 |
| Cfa 06328 Culebra & Galm | Sep. 23, 2026 | Chick-Fil-A | San Antonio | Bexar | New Construction | $4,500,000 | Nov. 08, 2026 | Apr. 13, 2028 |
| Jersey Mike's Babacock | Sep. 23, 2026 | Jersey Mike's | San Antonio | Bexar | Renovation/Alteration | $300,000 | Nov. 01, 2026 | Jan. 01, 2027 |
| Pinnacle Clinical Research Expansion | Sep. 23, 2026 | Pecan Valley Mob | San Antonio | Bexar | Renovation/Alteration | $237,500 | Oct. 19, 2026 | Dec. 21, 2026 |
| Table 39 | Sep. 23, 2026 | Table 39 | Ingram | Kerr | Renovation/Alteration | $50,000 | May. 01, 2026 | Jan. 01, 2027 |
| Dumont Creamery & Cafe | Sep. 23, 2026 | The Portico At Shaenfield | San Antonio | Bexar | New Construction | $150,000 | Oct. 30, 2026 | Feb. 26, 2027 |
| New Demising Wall | Sep. 23, 2026 | Building 1538 | San Antonio | Bexar | New Construction | $75,000 | Oct. 15, 2026 | Nov. 15, 2026 |
| Dr. Zebrowski Office | Sep. 22, 2026 | Dr. Zebrowski Office | San Antonio | Bexar | New Construction | $1,400,000 | Nov. 15, 2026 | May. 30, 2027 |
| Candy Cloud | Sep. 22, 2026 | Town Center At Creekside | New Braunfels | Comal | Renovation/Alteration | $117,000 | Oct. 01, 2026 | Feb. 01, 2027 |
| Vip Medical | Sep. 22, 2026 | Legent Westover Hills | San Antonio | Bexar | Renovation/Alteration | $409,000 | Nov. 02, 2026 | Apr. 01, 2027 |
| Maxim Healthcare | Sep. 22, 2026 | The Pyramid Building | San Antonio | Bexar | Renovation/Alteration | $264,000 | Jun. 28, 2026 | Jan. 31, 2027 |
| North Guadalupe St. Reconstruction | Sep. 22, 2026 | Street Reconstruction And Widening Project | Seguin | Guadalupe | New Construction | $132,135 | Nov. 15, 2026 | May. 15, 2027 |
| Srs 7570 Renovation | Sep. 22, 2026 | Srs Distribution | New Braunfels | Comal | Renovation/Alteration | $150,000 | Sep. 30, 2026 | Oct. 30, 2026 |
| Spc New Veterans' Hall And Dining Center | Sep. 22, 2026 | Spc New Veterans' Hall And Dining Center | San Antonio | Bexar | New Construction | $21,400,000 | Oct. 14, 2026 | Mar. 31, 2028 |
| Oic: Common Areas Level 8 | Sep. 21, 2026 | One International Center | San Antonio | Bexar | Renovation/Alteration | $149,496 | Sep. 28, 2026 | Dec. 21, 2026 |
| 520 Bonham Sushi Restaurant | Sep. 21, 2026 | 520 Bonham | San Antonio | Bexar | Renovation/Alteration | $87,600 | Oct. 15, 2026 | Nov. 20, 2026 |
| #26131 - Ads Sports Complex - Toilet Room Building | Sep. 21, 2026 | Sports Complex Training Facility | Converse | Bexar | New Construction | $300,000 | Oct. 05, 2026 | Dec. 01, 2026 |
| Shipley Do-Nuts | Sep. 21, 2026 | La Picosa Town Center | San Antonio | Bexar | Renovation/Alteration | $220,000 | Oct. 21, 2026 | Dec. 02, 2026 |
| Tmmtx Sitework 1 | Sep. 21, 2026 | Toyota Motor Manufacturing Texas | San Antonio | Bexar | New Construction | $200,000,000 | Dec. 01, 2026 | Dec. 01, 2028 |
| Gxo Industrial & Office Addition | Sep. 21, 2026 | Gxo Industrial & Office Addition | Schertz | Bexar | Additions to Existing Building | $900,000 | Oct. 05, 2026 | Nov. 30, 2026 |
| Rudeloff Road Phase 2 | Sep. 21, 2026 | Rudeloff Road | Seguin | Guadalupe | New Construction | $22,889,500 | Jan. 05, 2027 | May. 01, 2028 |
| Crispy Cones | Sep. 21, 2026 | Northwoods | San Antonio | Bexar | Renovation/Alteration | $100,000 | Oct. 01, 2026 | Feb. 01, 2027 |
| Baptist Credit Union Interior Renovations | Sep. 21, 2026 | Baptist Credit Union | San Antonio | Bexar | Renovation/Alteration | $180,000 | Nov. 30, 2026 | Mar. 31, 2027 |
| 4055-1020 Universal City, Tx Kangaroo Special | Sep. 21, 2026 | Walmart | Universal City | Bexar | Renovation/Alteration | $64,000 | Oct. 01, 2026 | Nov. 06, 2026 |
| Kyndwood Unit 8 | Sep. 18, 2026 | Kyndwood Ramps | New Braunfels | Comal | New Construction | $3,000,000 | Apr. 01, 2026 | Nov. 17, 2026 |
| Taco Bell - Ih 37 | Sep. 18, 2026 | Taco Bell | San Antonio | Bexar | New Construction | $1,200,000 | Jan. 04, 2027 | Jul. 30, 2027 |
| Or 36 Clean Supply Room Expansion | Sep. 18, 2026 | University Health - Sky Tower | San Antonio | Bexar | Renovation/Alteration | $216,667 | Nov. 12, 2026 | Dec. 14, 2026 |
| Toastique | Sep. 18, 2026 | Culebra Commons | San Antonio | Bexar | Renovation/Alteration | $350,000 | Nov. 02, 2026 | Jan. 29, 2027 |
| Gxo - Shertz, Tx | Sep. 18, 2026 | Gxo Logistics | Schertz | Bexar | Renovation/Alteration | $51,065,804 | Oct. 10, 2026 | Oct. 30, 2026 |
| Converse Texas Kangaroo Special - Store #5144-1011 | Sep. 18, 2026 | Wal-Mart | Converse | Bexar | Renovation/Alteration | $66,000 | Oct. 01, 2026 | Nov. 06, 2026 |
| Spec Office - Terrace Level | Sep. 18, 2026 | 1900 Broadway | San Antonio | Bexar | New Construction | $147,000 | Sep. 21, 2026 | Feb. 21, 2027 |
| Hudson House | Sep. 18, 2026 | 5307 Broadway | Alamo Heights | Bexar | Renovation/Alteration | $1,675,250 | Nov. 01, 2026 | Apr. 30, 2027 |
| Dental Shell - San Antonio, Tx | Sep. 17, 2026 | Dental Shell | San Antonio | Bexar | New Construction | $1,400,000 | Nov. 15, 2026 | Mar. 15, 2027 |
| 4949 Business Center | Sep. 17, 2026 | 4949 Business Center | San Antonio | Bexar | New Construction | $1,200,000 | Jan. 11, 2027 | Dec. 15, 2027 |
| #26080 - Core Office Interiors - Suite 101 Finish Out | Sep. 17, 2026 | Rvk Corporate Office | San Antonio | Bexar | Renovation/Alteration | $320,000 | Sep. 21, 2026 | Dec. 31, 2026 |
| Tia's Taco Hut | Sep. 17, 2026 | Forest Ridge Commercial Lot 50 | Schertz | Guadalupe | New Construction | $250,000 | Oct. 30, 2026 | Mar. 26, 2027 |
| Stop N Go Gyro | Sep. 17, 2026 | City Base Commons | San Antonio | Bexar | Renovation/Alteration | $300,000 | Oct. 01, 2026 | Mar. 01, 2027 |